South Bridge:
As of 2:52pm today, South Bridge is awash (water level same as pit top so pumping not an option).
Section 2:
The new bench board was taken out to the pit but was not cut to length, so if you're hunting Section 2 take a saw with you.
Grover
- Auto5man's blog
- Login to post comments
Hunter, we cut the board and put the saw and tape measure at the Triv house in the mud room. Left the extra end of the board in the pit.
John Blair
Mortgages and Duck
Use the extra board for an umbrella
-Hunter
Follow @3RiversDuckClub
I carried a tape measure and hand saw(on east side of the pit) to sec 2 but didn't have time cut. Pls return tools to me at "the den"....thanks
-Hunter